EPIC of Wellhead Platform LAM-C Project Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists .. | Dragon Oil Ltd. | Oil & Gas Upstream | Turkmenistan | Completed Projects | |
EPIC of Crude Oil Tank Farm Terminal Project Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area. | Dragon Oil Ltd. | Oil & Gas Downstream | Turkmenistan | Completed Projects | |
EPIC of Interconnecting Pipeline Project Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and.. | Dragon Oil Ltd. | Oil & Gas Downstream | Turkmenistan / Hazar | Completed Projects | |
EPCC of Centre of Excellence Building Project Turn-key construction of 1 storey building with infrastructure connections. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
EPIC of Mechanical Workshop Turn-key construction of mechanical workshop and car wash building. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Water Desalination and Intake Line Project Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant includi.. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Supply of Onshore & Offshore Cabins Phase I & II Phase I : Procurement & erection of 10 nos onshore cabins, Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins incl.. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Geo-Technical Survey for GTP in CPF Area and Harbour Berth 5 & 6 Boreholes, sampling, in-situ and laboratory testings. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Geo-Technical Survey at Hazar Harbour and Aladja Sea and ground surveys at parts of the Caspian and Aladja Land. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
EPCC of Waste Disposal Facility Project Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects |