Search

CLEAR
İLK CONSTRUCTION //PROJECTS

PROJECTS Showing Results 10 - 60 of 86

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
200 beds hospital project in Izmir. Medicana İzmir Hospital Project 200 beds hospital project in Izmir. Eremtas Civil, Architectural, Infrastr. Turkey Completed Projects
Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, helidecks, subsea and dubsea pipelines. EPIC of LAM-F Drilling Platform Project Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, he.. Dragon Oil Ltd. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists of Cargo Deck, Main Deck, Intermediate Deck and Drain Deck. EPIC of Wellhead Platform LAM-C Project Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists .. Dragon Oil Ltd. Oil & Gas Upstream Turkmenistan Completed Projects
Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area. EPIC of Crude Oil Tank Farm Terminal Project Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area. Dragon Oil Ltd. Oil & Gas Downstream Turkmenistan Completed Projects
Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and blasting, commissioning etc. EPIC of Interconnecting Pipeline Project Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and.. Dragon Oil Ltd. Oil & Gas Downstream Turkmenistan / Hazar Completed Projects
Turn-key construction of 1 storey building with infrastructure connections. EPCC of Centre of Excellence Building Project Turn-key construction of 1 storey building with infrastructure connections. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Turn-key construction of mechanical workshop and car wash building. EPIC of Mechanical Workshop Turn-key construction of mechanical workshop and car wash building. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant including 550 m sheet piling complete with piping installation (2 meters below sea level). Water Desalination and Intake Line Project Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant includi.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Phase I : Procurement & erection of 10 nos onshore cabins, 
Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins including furniture, stairs and roof structure etc. Supply of Onshore & Offshore Cabins Phase I & II Phase I : Procurement & erection of 10 nos onshore cabins, Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins incl.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Boreholes, sampling, in-situ and laboratory testings. Geo-Technical Survey for GTP in CPF Area and Harbour Berth 5 & 6 Boreholes, sampling, in-situ and laboratory testings. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects

Information Society Services