Search
- LOCATION
- PROJECT STATUS
- CLASSIFICATION
- CLIENT
- Dragon Oil Ltd.19
- Petronas Carigali (Turkmenistan) Sdn. Bhd.7
- Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V.2
- Hyundai Engineering Co., Ltd.3
- Botaş1
- Turkmen Gas / Hyundai Eng. Ltd.1
- Petrofac International (U.A.E.)4
- Petronas Carigali (Turkmenistan) Sdn. Bhd., MMHE Technip J.V. - Sumatec1
- Gilan Holding LLC2
- Administration of The President Turkmenistan5
- Pasha Construction7
- Thales Alenia Space - CIFAL FZCO1
- State Committee On Property Issues of The Republic of Azerbaijan1
- Azersu QJSC1
- -1
- Oil & Gas Trust SOCAR1
- Pasha Holding1
- Daykhan Bank State Commercial Bank of Turkmenistan1
- Central Bank of Turkmenistan1
- Ministry of Railway Transportation of Turkmenistan1
- Land Development Project3
- JGC Construction Co.2
- CAI Interbudmontaz1
- Turkmen Gas / Petrofac Int. (U.A.E.)1
- TSGI Mühendislik Insaat Ltd. (Técnicas Reunidas, Saipem and GS Consortium)1
- Aikon Construction MMC.1
- Baku Bus Limited Liability Company1
- Qaiwan Group1
- Azeravtoyol Asc1
- Eremtas1
- ILK CONSTRUCTION4
- Highland City1
- CPI Power Engineering Co., Ltd.1
- Arab Potash Company Ltd.1
- People's Democratic Republic of Algeria Ministry of National Defence1
İLK CONSTRUCTION
//PROJECTS
PROJECTS Showing Results 10 - 30 of 82
PROJECT | CLIENT | CLASSIFICATION | LOCATION | STATUS | |
EPCC of Centre of Excellence Building Project Turn-key construction of 1 storey building with infrastructure connections. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
EPIC of Mechanical Workshop Turn-key construction of mechanical workshop and car wash building. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Water Desalination and Intake Line Project Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant includi.. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Supply of Onshore & Offshore Cabins Phase I & II Phase I : Procurement & erection of 10 nos onshore cabins, Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins incl.. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Geo-Technical Survey for GTP in CPF Area and Harbour Berth 5 & 6 Boreholes, sampling, in-situ and laboratory testings. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Geo-Technical Survey at Hazar Harbour and Aladja Sea and ground surveys at parts of the Caspian and Aladja Land. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
EPCC of Waste Disposal Facility Project Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
EPCC of Polyclinic Project Design, procurement, construction and commissioning of 100 person per day capacity polyclinic building. Including technical building and storage tanks.. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Upgrade Of Berths The Detailed Engineering, Procurement, Construction, installation and Commissioning of berth facilities. | Dragon Oil Ltd. | Marine Structures | Turkmenistan | Completed Projects | |
Derrick Removal at Offshore Removal of old derricks (6 nos) from non-operating offshore oil platforms | Dragon Oil Ltd. | Oil & Gas Upstream | Turkmenistan | Completed Projects |