Search

CLEAR
İLK CONSTRUCTION //PROJECTS

PROJECTS Showing Results 10 - 70 of 82

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Engineering, procurement, construction and commissioning of  6 storey, 7.230 m² closed car park with 181 cars capacity. EPCC of Molokan Gardens Car Park Project Engineering, procurement, construction and commissioning of 6 storey, 7.230 m² closed car park with 181 cars capacity. Pasha Holding Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Turnkey architectural, fit-out, MEP and weak current construction works of Hospital Project. Construction of Constantine Anti Cancer Hospital Turnkey architectural, fit-out, MEP and weak current construction works of Hospital Project. People's Democratic Republic of Algeria Ministry of National Defence Civil, Architectural, Infrastr. Algeria / Constantine Projects in Progress
EPCC of CPF and GTU Substation Buildings and Pipe Spool. EPCC of Gas Field Development Project EPCC of CPF and GTU Substation Buildings and Pipe Spool Fabrication Works. EPCC of CPF and GTU Substation Buildings and Pipe Spool. Petrofac International (U.A.E.) Oil & Gas Downstream Turkmenistan / Yoloten / Mary Completed Projects
Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural  gas primary treatment system. Gas Treatment Units (GTU) of South Yoloten Gas Field Development Project Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system. Petrofac International (U.A.E.) Oil & Gas Downstream Turkmenistan / Yoloten / Mary Completed Projects
Engineering, Procurement, Construction and Commissioning of 712 persons capacity rotation camp including water treatment plant (RO), sewage treatment plant and other necessary facilities.
Total Closed Area : 18.826 m² EPCC of Rotation Camp of South Yoloten Gas Field Development Project Engineering, Procurement, Construction and Commissioning of 712 persons capacity rotation camp including water treatment plant (RO), sewage treatment .. Petrofac International (U.A.E.) Civil, Architectural, Infrastr. Turkmenistan / Yoloten / Mary Completed Projects
Earthworks, Infrastructure, Soil Investigation and Topographic & U/G Survey Works of South Yoloten Gas Field Development Project. South Yoloten Gas Field Development Project Earthworks, Infrastructure, Soil Investigation and Topographic & U/G Survey Works of South Yoloten Gas Field Development Project. Petrofac International (U.A.E.) Civil, Architectural, Infrastr. Turkmenistan / Yoloten / Mary Completed Projects
Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum process facilities. EPCC of Central Diyarbekir Oil Development Project Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan Completed Projects
Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water depth is 53.4 m. EPCC of West Diyarbekir Drilling Platform Project Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water de.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Turkmenbashi Completed Projects
EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth. EPCC of Garagol Deniz West Offshore Platform Project EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan Completed Projects
Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant subsea pipeline and cabling works. (Total : 3 Jackets - Topsides - Drilling Decks - Boatlandings and 14 Piles) EPIC of Offshore Transportation & Installation Works Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant s.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Kiyanly Completed Projects

Information Society Services