PROJECTS Showing Results 10 - 70 of 82

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Earthworks, Infrastructure, Soil Investigation and Topographic & U/G Survey Works of South Yoloten Gas Field Development Project. South Yoloten Gas Field Development Project Earthworks, Infrastructure, Soil Investigation and Topographic & U/G Survey Works of South Yoloten Gas Field Development Project. Petrofac International (U.A.E.) Civil, Architectural, Infrastr. Turkmenistan / Yoloten / Mary Completed Projects
Turn-key construction of 1 storey building with infrastructure connections. EPCC of Centre of Excellence Building Project Turn-key construction of 1 storey building with infrastructure connections. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Turn-key construction of mechanical workshop and car wash building. EPIC of Mechanical Workshop Turn-key construction of mechanical workshop and car wash building. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant including 550 m sheet piling complete with piping installation (2 meters below sea level). Water Desalination and Intake Line Project Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant includi.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Turn-key construction of accommodation, office and other mobilization facilities. 2.400 m² closed area and 200 person capacity. EPCC of Temporary Camp Facilities of Turkmenbashi Onshore Gas Terminal Project Turn-key construction of accommodation, office and other mobilization facilities. 2.400 m² closed area and 200 person capacity. Petronas Carigali (Turkmenistan) Sdn. Bhd. Civil, Architectural, Infrastr. Turkmenistan / Turkmenbashi Completed Projects
Phase I : Procurement & erection of 10 nos onshore cabins, 
Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins including furniture, stairs and roof structure etc. Supply of Onshore & Offshore Cabins Phase I & II Phase I : Procurement & erection of 10 nos onshore cabins, Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins incl.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Reinforced concrete works of city water treatment facility. Ashgabat City Water Treatment Project Reinforced concrete works of city water treatment facility. CAI Interbudmontaz Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Boreholes, sampling, in-situ and laboratory testings. Geo-Technical Survey for GTP in CPF Area and Harbour Berth 5 & 6 Boreholes, sampling, in-situ and laboratory testings. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Sea and ground surveys at parts of the Caspian and Aladja Land. Geo-Technical Survey at Hazar Harbour and Aladja Sea and ground surveys at parts of the Caspian and Aladja Land. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. EPCC of Waste Disposal Facility Project Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects

Information Society Services