İLK CONSTRUCTION //PROJECTS

PROJECTS Showing Results 10 - 80 of 86

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Reinforced concrete works of city water treatment facility. Ashgabat City Water Treatment Project Reinforced concrete works of city water treatment facility. CAI Interbudmontaz Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Boreholes, sampling, in-situ and laboratory testings. Geo-Technical Survey for GTP in CPF Area and Harbour Berth 5 & 6 Boreholes, sampling, in-situ and laboratory testings. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Sea and ground surveys at parts of the Caspian and Aladja Land. Geo-Technical Survey at Hazar Harbour and Aladja Sea and ground surveys at parts of the Caspian and Aladja Land. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. EPCC of Waste Disposal Facility Project Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Design, procurement, construction and commissioning of 100 person per day capacity polyclinic building. Including technical building and storage tanks. EPCC of Polyclinic Project Design, procurement, construction and commissioning of 100 person per day capacity polyclinic building. Including technical building and storage tanks.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Engineering, Procurement, Construction, and Completion (EPCC) of the North and South Breakwaters, and Associated Works including quaywall, wharf, mooring facility, access roads and temporary works at proposed new Kiyanly Supply Base (KSB), Turkmenistan. EPCC of Break water, Quay Wall, Mooring Facilities, Wharf, Beacon Light and Auxiliary Works Project Engineering, Procurement, Construction, and Completion (EPCC) of the North and South Breakwaters, and Associated Works including quaywall, wharf, moor.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Marine Structures Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
PCC of 106 nos 800 mm diameter bored secant pile.  Average pile height is 15 m. PCC of Secant Pile for Wharf Zone I & III Project PCC of 106 nos 800 mm diameter bored secant pile. Average pile height is 15 m. Petronas Carigali (Turkmenistan) Sdn. Bhd. Marine Structures Turkmenistan / Turkmenbashi Completed Projects
Construction of 56 m length and 7.5 m bridge and access roads. Pipe piles, pile cap beams, steel beams, concrete slab and road asphalting works. EPC of New Bridge Construction Over Murgap River Project Construction of 56 m length and 7.5 m bridge and access roads. Pipe piles, pile cap beams, steel beams, concrete slab and road asphalting works. Turkmen Gas / Petrofac Int. (U.A.E.) Marine Structures Turkmenistan / Yoloten / Mary Completed Projects
Removal of old derricks (6 nos) from non-operating offshore oil platforms Derrick Removal at Offshore Removal of old derricks (6 nos) from non-operating offshore oil platforms Dragon Oil Ltd. Oil & Gas Upstream Turkmenistan Completed Projects
Three New Wellhead Towers & Associated Pipelines for Water Injection EPIC For Three New Wellhead Towers & Associated Pipelines for Water Injection Three New Wellhead Towers & Associated Pipelines for Water Injection Dragon Oil Ltd. Oil & Gas Upstream Turkmenistan Completed Projects