PROJECTS Showing Results 10 - 30 of 82

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Engineering, procurement and construction of school. EPC of School for 600 student Project Engineering, procurement and construction of school. Administration of The President Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Construction of the Reinforced Concrete Package of offshore Leisure Facility in Boulevard Area. Sadko Project Phase II Construction of the Reinforced Concrete Package of offshore Leisure Facility in Boulevard Area. Aikon Construction MMC. Marine Structures Azerbaijan / Baku Completed Projects
Engineering, Procurement, Construction and Commissioning of 712 persons capacity rotation camp including water treatment plant (RO), sewage treatment plant and other necessary facilities.
Total Closed Area : 18.826 m² EPCC of Rotation Camp of South Yoloten Gas Field Development Project Engineering, Procurement, Construction and Commissioning of 712 persons capacity rotation camp including water treatment plant (RO), sewage treatment .. Petrofac International (U.A.E.) Civil, Architectural, Infrastr. Turkmenistan / Yoloten / Mary Completed Projects
Engineering, procurement and construction of Residential Building. EPC of Residential Building Project Engineering, procurement and construction of Residential Building. Administration of The President Turkmenistan Civil, Architectural, Infrastr. Turkmenistan Completed Projects
Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works. EPCC of Residential Building Construction Project Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works. Daykhan Bank State Commercial Bank of Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Pile cap breaking, excavation, compaction, gravel layering, insulation and structural works for 3 floor garage, 3 floor podium and 3 towers consisting of 32 floor residence floor. Port Baku Residence Project Pile cap breaking, excavation, compaction, gravel layering, insulation and structural works for 3 floor garage, 3 floor podium and 3 towers consisting.. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Design, procurement, construction and commissioning of 100 person per day capacity polyclinic building. Including technical building and storage tanks. EPCC of Polyclinic Project Design, procurement, construction and commissioning of 100 person per day capacity polyclinic building. Including technical building and storage tanks.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant subsea pipeline and cabling works. (Total : 3 Jackets - Topsides - Drilling Decks - Boatlandings and 14 Piles) EPIC of Offshore Transportation & Installation Works Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant s.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Kiyanly Completed Projects
Removal of existing pedestal cranes and engineering, procurement, installation and commissioning works for new pedestal cranes at existing five numbers of offshore platforms. EPIC of Offshore Pedestal Crane Replacement Removal of existing pedestal cranes and engineering, procurement, installation and commissioning works for new pedestal cranes at existing five number.. Dragon Oil Ltd. Oil & Gas Turkmenistan / Hazar Projects in Progress
Procurement, Construction, Tie-in and Commissioning of New Main Brine Intake Pumping Statin at Dead Sea. 561 nos vertical and raked steel pile, 7,000 tons steel structure, 15,000 m2 timber, 12,000 meters process pipe, 12,000 m3 concrete, 2,300 tons rebar, 4 nos pump, 10,000 meters cable to be supplied, constructed and commissioned. New Main Brine Intake Pumping Station Construction Project (Civil & E/M Works) Procurement, Construction, Tie-in and Commissioning of New Main Brine Intake Pumping Statin at Dead Sea. 561 nos vertical and raked steel pile, 7,000 .. Arab Potash Company Ltd. Marine Structures Jordan Projects in Progress

Information Society Services