Search
- LOCATION
- PROJECT STATUS
- CLASSIFICATION
- CLIENT
- Dragon Oil Ltd.19
- Petronas Carigali (Turkmenistan) Sdn. Bhd.7
- Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V.2
- Hyundai Engineering Co., Ltd.3
- Botaş1
- Turkmen Gas / Hyundai Eng. Ltd.1
- Petrofac International (U.A.E.)4
- Petronas Carigali (Turkmenistan) Sdn. Bhd., MMHE Technip J.V. - Sumatec1
- Gilan Holding LLC2
- Administration of The President Turkmenistan5
- Pasha Construction7
- Thales Alenia Space - CIFAL FZCO1
- State Committee On Property Issues of The Republic of Azerbaijan1
- Azersu QJSC1
- -1
- Oil & Gas Trust SOCAR1
- Pasha Holding1
- Daykhan Bank State Commercial Bank of Turkmenistan1
- Central Bank of Turkmenistan1
- Ministry of Railway Transportation of Turkmenistan1
- Ural Garant1
- Land Development Project3
- JGC Construction Co.2
- CAI Interbudmontaz1
- ODD Uralyevrostil1
- Public Corporation Prodim1
- Turkmen Gas / Petrofac Int. (U.A.E.)1
- Stroy Zakas1
- TSGI Mühendislik Insaat Ltd. (Técnicas Reunidas, Saipem and GS Consortium)1
- Aikon Construction MMC.1
- Baku Bus Limited Liability Company1
- Qaiwan Group1
- Azeravtoyol Asc1
- Eremtas1
- ILK CONSTRUCTION4
- Highland City1
- CPI Power Engineering Co., Ltd.1
- Arab Potash Company Ltd.1
- People's Democratic Republic of Algeria Ministry of National Defence1
İLK CONSTRUCTION
//PROJECTS
PROJECTS Showing Results 10 - 50 of 86
PROJECT | CLIENT | CLASSIFICATION | LOCATION | STATUS | |
Konya Medicana Hospital Project 55 bed general intensive care, cardiovascular surgery intensive care, coronary intensive care units, 45-bed neonatal intensive care unit with a tota.. | Land Development Project | Civil, Architectural, Infrastr. | Turkey / Konya | Completed Projects | |
EPCC of Kindergarten & School Project Engineering, procurement, construction and commissioning of school project for 600 student. | Administration of The President Turkmenistan | Civil, Architectural, Infrastr. | Turkmenistan / Ashgabat | Completed Projects | |
EPC of Kindergarten Project for 160 student Engineering, procurement and construction of Kindergarten. | Administration of The President Turkmenistan | Civil, Architectural, Infrastr. | Turkmenistan / Ashgabat | Completed Projects | |
İzmir Konak Combined Project It is a commercial project with a profit partnership with Vakıfgyo, with two towers on a 17703 m2 parcel and a total construction area of 125000 m2 co.. | - | Civil, Architectural, Infrastr. | Turkey / İzmir | Projects in Progress | |
Intourist Hotel Project RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. | Pasha Construction | Civil, Architectural, Infrastr. | Azerbaijan / Baku | Completed Projects | |
EPIC of Interconnecting Pipeline Project Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and.. | Dragon Oil Ltd. | Oil & Gas Downstream | Turkmenistan / Hazar | Completed Projects | |
EPCC of Gipcak Resting Park Project Turn-key construction park project with 30 pieces fountains and green area. | Ministry of Railway Transportation of Turkmenistan | Civil, Architectural, Infrastr. | Turkmenistan / Ashgabat | Completed Projects | |
Geo-Technical Survey for GTP in CPF Area and Harbour Berth 5 & 6 Boreholes, sampling, in-situ and laboratory testings. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Geo-Technical Survey at Hazar Harbour and Aladja Sea and ground surveys at parts of the Caspian and Aladja Land. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Gas Treatment Units (GTU) of South Yoloten Gas Field Development Project Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system. | Petrofac International (U.A.E.) | Oil & Gas Downstream | Turkmenistan / Yoloten / Mary | Completed Projects |