Search
- LOCATION
- PROJECT STATUS
- CLASSIFICATION
- CLIENT
- Dragon Oil Ltd.19
- Petronas Carigali (Turkmenistan) Sdn. Bhd.7
- Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V.2
- Hyundai Engineering Co., Ltd.3
- Botaş1
- Turkmen Gas / Hyundai Eng. Ltd.1
- Petrofac International (U.A.E.)4
- Petronas Carigali (Turkmenistan) Sdn. Bhd., MMHE Technip J.V. - Sumatec1
- Gilan Holding LLC2
- Administration of The President Turkmenistan5
- Pasha Construction7
- Thales Alenia Space - CIFAL FZCO1
- State Committee On Property Issues of The Republic of Azerbaijan1
- Azersu QJSC1
- -1
- Oil & Gas Trust SOCAR1
- Pasha Holding1
- Daykhan Bank State Commercial Bank of Turkmenistan1
- Central Bank of Turkmenistan1
- Ministry of Railway Transportation of Turkmenistan1
- Land Development Project3
- JGC Construction Co.2
- CAI Interbudmontaz1
- Turkmen Gas / Petrofac Int. (U.A.E.)1
- TSGI Mühendislik Insaat Ltd. (Técnicas Reunidas, Saipem and GS Consortium)1
- Aikon Construction MMC.1
- Baku Bus Limited Liability Company1
- Qaiwan Group1
- Azeravtoyol Asc1
- Eremtas1
- ILK CONSTRUCTION4
- Highland City1
- CPI Power Engineering Co., Ltd.1
- Arab Potash Company Ltd.1
- People's Democratic Republic of Algeria Ministry of National Defence1
İLK CONSTRUCTION
//PROJECTS
PROJECTS Showing Results 10 - 50 of 82
PROJECT | CLIENT | CLASSIFICATION | LOCATION | STATUS | |
EPC of Kindergarten Project for 160 student Engineering, procurement and construction of Kindergarten. | Administration of The President Turkmenistan | Civil, Architectural, Infrastr. | Turkmenistan / Ashgabat | Completed Projects | |
İzmir Konak Combined Project It is a commercial project with a profit partnership with Vakıfgyo, with two towers on a 17703 m2 parcel and a total construction area of 125000 m2 co.. | - | Civil, Architectural, Infrastr. | Turkey / İzmir | Projects in Progress | |
Intourist Hotel Project RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. | Pasha Construction | Civil, Architectural, Infrastr. | Azerbaijan / Baku | Completed Projects | |
EPIC of Interconnecting Pipeline Project Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and.. | Dragon Oil Ltd. | Oil & Gas Downstream | Turkmenistan / Hazar | Completed Projects | |
EPCC of Gipcak Resting Park Project Turn-key construction park project with 30 pieces fountains and green area. | Ministry of Railway Transportation of Turkmenistan | Civil, Architectural, Infrastr. | Turkmenistan / Ashgabat | Completed Projects | |
Geo-Technical Survey for GTP in CPF Area and Harbour Berth 5 & 6 Boreholes, sampling, in-situ and laboratory testings. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Geo-Technical Survey at Hazar Harbour and Aladja Sea and ground surveys at parts of the Caspian and Aladja Land. | Dragon Oil Ltd. | Civil, Architectural, Infrastr. | Turkmenistan / Hazar | Completed Projects | |
Gas Treatment Units (GTU) of South Yoloten Gas Field Development Project Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system. | Petrofac International (U.A.E.) | Oil & Gas Downstream | Turkmenistan / Yoloten / Mary | Completed Projects | |
Gas Treatment Plant Project Onshore Gas Terminal (GTPOGT) Expansion and Modification for Garagol Deniz West Oil Development Soil investigation, site preparation, building, civil, electrical, instrumentation, equipment, field tank, HVAC, insulation and piping works. | Hyundai Engineering Co., Ltd. | Oil & Gas Downstream | Turkmenistan / Kiyanly / Turkmenbashi | Completed Projects | |
EPCC of Gas Field Development Project EPCC of CPF and GTU Substation Buildings and Pipe Spool Fabrication Works. EPCC of CPF and GTU Substation Buildings and Pipe Spool. | Petrofac International (U.A.E.) | Oil & Gas Downstream | Turkmenistan / Yoloten / Mary | Completed Projects |