Search

CLEAR
İLK CONSTRUCTION //PROJECTS

PROJECTS Showing Results 10 - 40 of 82

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
600 nos of 650 dia piles of various lengths from 10 to 19 m and 15.000 m of anchorage works. Ganjlik Mall Project, Piling Works Project 600 nos of 650 dia piles of various lengths from 10 to 19 m and 15.000 m of anchorage works. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth. EPCC of Garagol Deniz West Offshore Platform Project EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan Completed Projects
EPCC of CPF and GTU Substation Buildings and Pipe Spool. EPCC of Gas Field Development Project EPCC of CPF and GTU Substation Buildings and Pipe Spool Fabrication Works. EPCC of CPF and GTU Substation Buildings and Pipe Spool. Petrofac International (U.A.E.) Oil & Gas Downstream Turkmenistan / Yoloten / Mary Completed Projects
Soil investigation, site preparation, building, civil, electrical, instrumentation, equipment, field tank, HVAC, insulation and piping works. Gas Treatment Plant Project Onshore Gas Terminal (GTPOGT) Expansion and Modification for Garagol Deniz West Oil Development Soil investigation, site preparation, building, civil, electrical, instrumentation, equipment, field tank, HVAC, insulation and piping works. Hyundai Engineering Co., Ltd. Oil & Gas Downstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural  gas primary treatment system. Gas Treatment Units (GTU) of South Yoloten Gas Field Development Project Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system. Petrofac International (U.A.E.) Oil & Gas Downstream Turkmenistan / Yoloten / Mary Completed Projects
Sea and ground surveys at parts of the Caspian and Aladja Land. Geo-Technical Survey at Hazar Harbour and Aladja Sea and ground surveys at parts of the Caspian and Aladja Land. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Boreholes, sampling, in-situ and laboratory testings. Geo-Technical Survey for GTP in CPF Area and Harbour Berth 5 & 6 Boreholes, sampling, in-situ and laboratory testings. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Turn-key construction park project with 30 pieces fountains and green area. EPCC of Gipcak Resting Park Project Turn-key construction park project with 30 pieces fountains and green area. Ministry of Railway Transportation of Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and blasting, commissioning etc. EPIC of Interconnecting Pipeline Project Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and.. Dragon Oil Ltd. Oil & Gas Downstream Turkmenistan / Hazar Completed Projects
RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. Intourist Hotel Project RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects

Information Society Services