Search

CLEAR
İLK CONSTRUCTION //PROJECTS

PROJECTS Showing Results 10 - 10 of 82

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Cifteler Solar Farm ILK CONSTRUCTION Renewable Energy Investments Turkey Completed Projects
Uluborlu Solar ILK CONSTRUCTION Renewable Energy Investments Turkey / Isparta Completed Projects
Front – End Engineering Design of  Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations Feed for Xarajyan Oil Terminal Front – End Engineering Design of Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations Qaiwan Group Oil & Gas Downstream Iraq / Sulaymaniah Completed Projects
RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. Intourist Hotel Project RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area. EPIC of Crude Oil Tank Farm Terminal Project Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area. Dragon Oil Ltd. Oil & Gas Downstream Turkmenistan Completed Projects
Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water depth is 53.4 m. EPCC of West Diyarbekir Drilling Platform Project Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water de.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Turkmenbashi Completed Projects
RC Frame & Block Work & Screed works of Hotel consisting of 80.000 m² closed area and 822 bed capacity. Baku White City Hotel Project RC Frame & Block Work & Screed works of Hotel consisting of 80.000 m² closed area and 822 bed capacity. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists of Cargo Deck, Main Deck, Intermediate Deck and Drain Deck. EPIC of Wellhead Platform LAM-C Project Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists .. Dragon Oil Ltd. Oil & Gas Upstream Turkmenistan Completed Projects
Procurement, fabrication, Integration of Collector Riser Platform. Maghtumguly Collector Riser Platform Project Procurement, fabrication, Integration of Collector Riser Platform. Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
Temporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, blasting & painting, mechanical completion, testing & commissioning, load out, sea fastening, hook up & commissioning. Maghtumguly Drilling Platform-A Project Temporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, b.. Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects