Search
- LOCATION
- PROJECT STATUS
- CLASSIFICATION
- CLIENT
- Dragon Oil Ltd.19
- Petronas Carigali (Turkmenistan) Sdn. Bhd.7
- Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V.2
- Hyundai Engineering Co., Ltd.3
- Botaş1
- Turkmen Gas / Hyundai Eng. Ltd.1
- Petrofac International (U.A.E.)4
- Petronas Carigali (Turkmenistan) Sdn. Bhd., MMHE Technip J.V. - Sumatec1
- Gilan Holding LLC2
- Administration of The President Turkmenistan5
- Pasha Construction7
- Thales Alenia Space - CIFAL FZCO1
- State Committee On Property Issues of The Republic of Azerbaijan1
- Azersu QJSC1
- -1
- Oil & Gas Trust SOCAR1
- Pasha Holding1
- Daykhan Bank State Commercial Bank of Turkmenistan1
- Central Bank of Turkmenistan1
- Ministry of Railway Transportation of Turkmenistan1
- Ural Garant1
- Land Development Project3
- JGC Construction Co.2
- CAI Interbudmontaz1
- ODD Uralyevrostil1
- Public Corporation Prodim1
- Turkmen Gas / Petrofac Int. (U.A.E.)1
- Stroy Zakas1
- TSGI Mühendislik Insaat Ltd. (Técnicas Reunidas, Saipem and GS Consortium)1
- Aikon Construction MMC.1
- Baku Bus Limited Liability Company1
- Qaiwan Group1
- Azeravtoyol Asc1
- Eremtas1
- ILK CONSTRUCTION4
- Highland City1
- CPI Power Engineering Co., Ltd.1
- Arab Potash Company Ltd.1
- People's Democratic Republic of Algeria Ministry of National Defence1
İLK CONSTRUCTION
//PROJECTS
PROJECTS Showing Results 10 - 20 of 86
PROJECT | CLIENT | CLASSIFICATION | LOCATION | STATUS | |
EPIC of Interconnecting Pipeline Project Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and.. | Dragon Oil Ltd. | Oil & Gas Downstream | Turkmenistan / Hazar | Completed Projects | |
Turkmenistan Gas Desulfurization Project Civil, Architectural and HVAC works, Building Works, Tank & Silo Installation Works, Soil Investigation Works, Underground Piping Installation & Paint.. | Turkmen Gas / Hyundai Eng. Ltd. | Oil & Gas Downstream | Turkmenistan / Yoloten / Mary | Completed Projects | |
EPCC of Baku Shipyard Project Engineering, procurement, construction and commissioning of 24.000 m² closed area shipyard project steel and reinforced concrete buildings, infrastruc.. | Oil & Gas Trust SOCAR | Civil, Architectural, Infrastr. | Azerbaijan / Baku | Completed Projects | |
EPCC of Rotation Camp of South Yoloten Gas Field Development Project Engineering, Procurement, Construction and Commissioning of 712 persons capacity rotation camp including water treatment plant (RO), sewage treatment .. | Petrofac International (U.A.E.) | Civil, Architectural, Infrastr. | Turkmenistan / Yoloten / Mary | Completed Projects | |
EPCC of Molokan Gardens Car Park Project Engineering, procurement, construction and commissioning of 6 storey, 7.230 m² closed car park with 181 cars capacity. | Pasha Holding | Civil, Architectural, Infrastr. | Azerbaijan / Baku | Completed Projects | |
28 May Shopping Mall Project Dismantling existing ramp, additional slab construction and strengthening of existing columns. | Pasha Construction | Civil, Architectural, Infrastr. | Azerbaijan / Baku | Completed Projects | |
EPCC of Kindergarten & School Project Engineering, procurement, construction and commissioning of school project for 600 student. | Administration of The President Turkmenistan | Civil, Architectural, Infrastr. | Turkmenistan / Ashgabat | Completed Projects | |
EPCC of Residential Building Construction Project Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works. | Daykhan Bank State Commercial Bank of Turkmenistan | Civil, Architectural, Infrastr. | Turkmenistan / Ashgabat | Completed Projects | |
The State Commodity and Raw Material Exchange Residential Building Project Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works. | Administration of The President Turkmenistan | Civil, Architectural, Infrastr. | Turkmenistan / Ashgabat | Completed Projects | |
Central Bank Residential Building Construction Project Turn-key construction of 12 floors 48 flats residential building. | Central Bank of Turkmenistan | Civil, Architectural, Infrastr. | Turkmenistan / Ashgabat | Completed Projects |