Search

CLEAR
İLK CONSTRUCTION //PROJECTS

PROJECTS Showing Results 10 - 30 of 86

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Turn-key construction park project with 30 pieces fountains and green area. EPCC of Gipcak Resting Park Project Turn-key construction park project with 30 pieces fountains and green area. Ministry of Railway Transportation of Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Earthworks, Infrastructure, Soil Investigation and Topographic & U/G Survey Works of South Yoloten Gas Field Development Project. South Yoloten Gas Field Development Project Earthworks, Infrastructure, Soil Investigation and Topographic & U/G Survey Works of South Yoloten Gas Field Development Project. Petrofac International (U.A.E.) Civil, Architectural, Infrastr. Turkmenistan / Yoloten / Mary Completed Projects
Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant including 550 m sheet piling complete with piping installation (2 meters below sea level). Water Desalination and Intake Line Project Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant includi.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Reinforced concrete works of residential building project. AVRORA 16 & 25 Floor Residential Building and Closed Garage Project Reinforced concrete works of residential building project. Ural Garant Civil, Architectural, Infrastr. Russia / Yekaterinburg Completed Projects
Reinforced concrete and brick works of 16 floors residential flats, offices and parking garage. 16 Floors Luxury Living Houses and Offices Pokrovskiy Project Reinforced concrete and brick works of 16 floors residential flats, offices and parking garage. Stroy Zakas Civil, Architectural, Infrastr. Russia / Yekaterinburg Completed Projects
Phase I : Turnkey construction of 6 villas.
Phase II: Turnkey construction of 6 villas combined of 12 separate houses. Zekeriyakoy Villa Project Phase I & II Phase I : Turnkey construction of 6 villas. Phase II: Turnkey construction of 6 villas combined of 12 separate houses. Land Development Project Civil, Architectural, Infrastr. Turkey / istanbul Completed Projects
Reinforced concrete  works of 20 floors business centre and small hotel complex.
Closed Area : 20.700 m² Palladium 20-Store A-Class Business Centre and Small Hotel Project Reinforced concrete works of 20 floors business centre and small hotel complex. Closed Area : 20.700 m² Public Corporation Prodim Civil, Architectural, Infrastr. Russia / Yekaterinburg Completed Projects
PCC of 106 nos 800 mm diameter bored secant pile.  Average pile height is 15 m. PCC of Secant Pile for Wharf Zone I & III Project PCC of 106 nos 800 mm diameter bored secant pile. Average pile height is 15 m. Petronas Carigali (Turkmenistan) Sdn. Bhd. Marine Structures Turkmenistan / Turkmenbashi Completed Projects
Construction of 56 m length and 7.5 m bridge and access roads. Pipe piles, pile cap beams, steel beams, concrete slab and road asphalting works. EPC of New Bridge Construction Over Murgap River Project Construction of 56 m length and 7.5 m bridge and access roads. Pipe piles, pile cap beams, steel beams, concrete slab and road asphalting works. Turkmen Gas / Petrofac Int. (U.A.E.) Marine Structures Turkmenistan / Yoloten / Mary Completed Projects
EPCC of CPF and GTU Substation Buildings and Pipe Spool. EPCC of Gas Field Development Project EPCC of CPF and GTU Substation Buildings and Pipe Spool Fabrication Works. EPCC of CPF and GTU Substation Buildings and Pipe Spool. Petrofac International (U.A.E.) Oil & Gas Downstream Turkmenistan / Yoloten / Mary Completed Projects

Information Society Services