PROJECTS Showing Results 10 - 60 of 86

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Fabrication, erection, installation, NDT and hydro test of 11 pieces fixed & floating roof tanks, painting and commissioning. Tankage Works at OGT Project Fabrication, erection, installation, NDT and hydro test of 11 pieces fixed & floating roof tanks, painting and commissioning. Petronas Carigali (Turkmenistan) Sdn. Bhd., MMHE Technip J.V. - Sumatec Oil & Gas Downstream Turkmenistan / Turkmenbashi Completed Projects
Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural  gas primary treatment system. Gas Treatment Units (GTU) of South Yoloten Gas Field Development Project Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system. Petrofac International (U.A.E.) Oil & Gas Downstream Turkmenistan / Yoloten / Mary Completed Projects
Turn-key construction of mechanical workshop and car wash building. EPIC of Mechanical Workshop Turn-key construction of mechanical workshop and car wash building. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Turnkey construction of 8 storey business plaza. Atasehir İLK Doguş Plaza Project Turnkey construction of 8 storey business plaza. Land Development Project Civil, Architectural, Infrastr. Turkey / istanbul Completed Projects
Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. EPCC of Waste Disposal Facility Project Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Design, procurement, construction and commissioning of 100 person per day capacity polyclinic building. Including technical building and storage tanks. EPCC of Polyclinic Project Design, procurement, construction and commissioning of 100 person per day capacity polyclinic building. Including technical building and storage tanks.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Reinforced concrete and block works of Technical University. UGMK Technical University Construction Project Reinforced concrete and block works of Technical University. ODD Uralyevrostil Civil, Architectural, Infrastr. Russia / V. Pishma Completed Projects
Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists of Cargo Deck, Main Deck, Intermediate Deck and Drain Deck. EPIC of Wellhead Platform LAM-C Project Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists .. Dragon Oil Ltd. Oil & Gas Upstream Turkmenistan Completed Projects
Procurement, fabrication, Integration of Collector Riser Platform. Maghtumguly Collector Riser Platform Project Procurement, fabrication, Integration of Collector Riser Platform. Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
Temporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, blasting & painting, mechanical completion, testing & commissioning, load out, sea fastening, hook up & commissioning. Maghtumguly Drilling Platform-A Project Temporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, b.. Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects