Search

CLEAR
İLK CONSTRUCTION //PROJECTS

PROJECTS Showing Results 10 - 86 of 86

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water depth is 53.4 m. EPCC of West Diyarbekir Drilling Platform Project Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water de.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Turkmenbashi Completed Projects
Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area. EPIC of Crude Oil Tank Farm Terminal Project Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area. Dragon Oil Ltd. Oil & Gas Downstream Turkmenistan Completed Projects
RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. Intourist Hotel Project RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Front – End Engineering Design of  Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations Feed for Xarajyan Oil Terminal Front – End Engineering Design of Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations Qaiwan Group Oil & Gas Downstream Iraq / Sulaymaniah Completed Projects
Cifteler Solar Farm ILK CONSTRUCTION Renewable Energy Investments Turkey Completed Projects
Uluborlu Solar ILK CONSTRUCTION Renewable Energy Investments Turkey / Isparta Completed Projects

Information Society Services