EPIC of LAM-F Drilling Platform Project

  • CLIENTDragon Oil Ltd.
  • LOCATION Turkmenistan / Kiyanly / Turkmenbashi
  • STATUS Completed Projects
  • SCOPE OF WORKS
  • Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, helidecks, subsea and dubsea pipelines.

PROJECT DETAILS

Main Products

 

Piles

42" - 25.4 mm WT – 1,545 tons

Grouting

400 tons

Jacket

2 nos of 6 legged &1 nos 4 legged jacket (total 1536 tons)

Appurtenances (Anodes, Boatlanding,Walkways etc.)

4 nos of Boat Landing, 312 nos 394 kg each Anodes – 330 tons

Topside

2.296 tons * Helidecks : 150 tons

Piping

300 tons

Mechanical (Equipment) Erection

350 tons

Electrical Installation

100 tons

Instrument Installation

48 tons

10’’ Subsea Pipeline

4 km

Total tonnage of platform

6.815 tons

Deck Elevations and Sizes

+17.800 Main Deck - 46.50 x 75.00 m (for drilling platform) + 12.300

Drain Deck - 40.00 x 70.50 m (for drilling platform) + 17.800

Main Deck - 40.00 x 25.00 m (for LQ platform) + 12.300

Drain Deck - 40.00 x 70.50 m (for LQ platform)