Maghtumguly Drilling Platform-A Project

  • CLIENTPetronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V.
  • LOCATION Turkmenistan / Kiyanly / Turkmenbashi
  • STATUS Completed Projects
  • SCOPE OF WORKS
  • Temporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, blasting & painting, mechanical completion, testing & commissioning, load out, sea fastening, hook up & commissioning.

PROJECT DETAILS

Main Products

Platform

Net weight: 161 tons

 

Gross Weight: 186 tons

Jacket

Net weight: 484 tons

 

Gross Weight: 557 tons

Piles

4 nos 914 mm (36”) diameter 7 m x 7 m spacing 

 

Net weight: 346 tons

 

Gross Weight: 186 tons

Conductors

9 nos 660 mm dia.

Total Height

68.20 m

 

Lower section of jacket is between -60.200 and 29.200

 

Upper section of jacket is between -29.200 and +8.000

Total tonnage of platform

1.114 tons.

 

 

 