İLK CONSTRUCTION// Oil & Gas //Downstream

TACE - Turkmenistan Ethane Cracker and Polyprophylene and Polyethylene Plant

  • CLIENTHyundai Engineering Co., Ltd.
  • LOCATION Turkmenistan
  • STATUS Completed Projects
  • SCOPE OF WORKS
  • Civil, Architectural, Steel, Piping, HVAC, Blasting&Painting, Firefighting, Insulation, NDE and Temporary Works of Ethane Cracker and Polyprophylene and Polyethylene Plant

PROJECT DETAILS

Main Products
  • Site Preparation works of Main and Temporary Area.

  • Civil works of Temporary Facilities

  • Temporary Reverse Osmosis System and Pipeline

  • Civil and Architectural Works

  • Internal roads of Plant

  • EPC of Reverse Osmosis System

  • General Contracting Works of Poly Propylene Package

Site Preparation 1&2 Packages

Disposal

1,886,403 m3

Soil Cutting

3,898,926 m3

Soil Excavation

984,259 m3

Soil Filling and Compaction with Excavated Soil

2,001,493 m3

Soil Filling with Cutting Soils

995,289 m3

Top-soil Stripping and clearing

436,845 m3

 

Civil 1&2 Architectural 1&2 Packages

 

Excavation  

647,150 m3

Backfill 

168106 m3

Concrete 

73,785 m3

Formwork  

196,302 m2

Re-Bar 

9,482 ton

Structural Steel

175 ton

Paving

15,443 m2

 

Temporary Site Facility Package

 

Earthwork

224.520 m3

Concrete 

19.358 m3

Screed 

82.007 m2

Gravel Paving 

100.400 m2

Asphalt Paving  

26.495 m2

Concrete Paving

4.215 m2

Fence

6.490 m

 

 

Reverse Osmosis Package EPC with O&M Responsibility

 

R.O capacity

50 ton/hr

Treated Water reservoir

1.500 m3

TDS

(below) 250 ppm

Operation and Maintenance 

3 years

 

 

Painting Package

 

Painting works of UTOS, HDPE, Polymer Warehouse piping and tank pank plates.

Total Painting Area

121,509 m2

 

 

Plant Roads Package

 

Asphalt road with shoulder

95,958.0 m2

Concrete type road without shoulder

24,133.0 m2

 

 

Polypropylene Package General Contracting Works

Civil & Architectural Works

 

Excavation&Backfill 

40.234 m3

Concrete 

8.039 m3

Fireproofing 

2.300 m2

Formwork 

21.788 m2

Re-Bar 

728 ton

Structural Steel 

2.329 tons (Including Grating, Handrail etc.)

 

Other Packages

Structural Steel Package

 

Steel 

4.422 tons

Piping Works

 

Piping 

64.333 D-I

UG Piping

4.956 D-I

Firefighting Works

 

NDT Works

 

HVAC Works

 

Mechanical Erection Works

902 ton

Insulation Works

1.006 m2

 

 

 

 

Information Society Services