EPCC of West Diyarbekir Drilling Platform Project

  • CLIENTPetronas Carigali (Turkmenistan) Sdn. Bhd.
  • LOCATION Turkmenistan / Turkmenbashi
  • STATUS Completed Projects
  • SCOPE OF WORKS
  • Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water depth is 53.4 m.

PROJECT DETAILS

Main Products

Piles

1.200 tons

Jacket

2.350 tons including appurtenances (Anodes, Boatlanding, Walkways etc.)

Topside

2.600 tons including piping, E&I and equipment weights.

Drilling Deck

250 tons

Total tonnage of platform

6.400 tons (including piles)

Facilities / Equipment

 

 

MPFM (Multiphase Flow Meter)

 

Heat Exchanger

 

HHP Separator (23 kBOPD)

 

MEG InjectionPPD Injection

 

Generator GEG & EDG (550 kW/ea)

 

ESD System with valve

 

PIG Launcher 18”

 

Telecom / Fiber Optic to MOPU

 

Host Tie-ins (MCR-A / MOPU / FSO / CD)

 

 

 

 