PROJECTS Showing Results 10 - 30 of 44

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Civil Work for Block Number: E3,E4,F1,F2           Constructed Floor Area  : 30.000 m2 Tashkent City Project - Lot 1 Civil Work for Block Number: E3,E4,F1,F2 Constructed Floor Area : 30.000 m2 Highland City Civil, Architectural, Infrastr. Uzbekistan / Tashkent Completed Projects
Construction of subsea 3 storey car park, 8 storey podium and 170 m of tower building. Production items include; earthworks, pile cap breaking, waterproofing, reinforced concrete works , earthing & lightning protection works, storm water disposal system works. Crescent Development Project Construction of subsea 3 storey car park, 8 storey podium and 170 m of tower building. Production items include; earthworks, pile cap breaking, waterp.. Gilan Holding LLC Civil, Architectural, Infrastr. Azerbaijan Completed Projects
Construction of 1 storey car park, 1 storey Spa, 1 storey restaurant and 5 storey hotel building, consisting of 32,000 m² closed area. EPC of Gabala Hotel & Spa Chenot Construction of 1 storey car park, 1 storey Spa, 1 storey restaurant and 5 storey hotel building, consisting of 32,000 m² closed area. Gilan Holding LLC Civil, Architectural, Infrastr. Azerbaijan Completed Projects
200 beds hospital project in Izmir. Medicana İzmir Hospital Project 200 beds hospital project in Izmir. Eremtas Civil, Architectural, Infrastr. Turkey Completed Projects
Turn-key construction of 1 storey building with infrastructure connections. EPCC of Centre of Excellence Building Project Turn-key construction of 1 storey building with infrastructure connections. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Turn-key construction of mechanical workshop and car wash building. EPIC of Mechanical Workshop Turn-key construction of mechanical workshop and car wash building. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant including 550 m sheet piling complete with piping installation (2 meters below sea level). Water Desalination and Intake Line Project Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant includi.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Phase I : Procurement & erection of 10 nos onshore cabins, 
Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins including furniture, stairs and roof structure etc. Supply of Onshore & Offshore Cabins Phase I & II Phase I : Procurement & erection of 10 nos onshore cabins, Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins incl.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Boreholes, sampling, in-situ and laboratory testings. Geo-Technical Survey for GTP in CPF Area and Harbour Berth 5 & 6 Boreholes, sampling, in-situ and laboratory testings. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Sea and ground surveys at parts of the Caspian and Aladja Land. Geo-Technical Survey at Hazar Harbour and Aladja Sea and ground surveys at parts of the Caspian and Aladja Land. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects