Search

CLEAR

PROJECTS Showing Results 10 - 48 of 48

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Civil Work for Block Number: E3,E4,F1,F2           Constructed Floor Area  : 30.000 m2 Tashkent City Project - Lot 1 Civil Work for Block Number: E3,E4,F1,F2 Constructed Floor Area : 30.000 m2 Highland City Civil, Architectural, Infrastr. Uzbekistan / Tashkent Completed Projects
Turn-key construction of accommodation, office and other mobilization facilities. 2.400 m² closed area and 200 person capacity. EPCC of Temporary Camp Facilities of Turkmenbashi Onshore Gas Terminal Project Turn-key construction of accommodation, office and other mobilization facilities. 2.400 m² closed area and 200 person capacity. Petronas Carigali (Turkmenistan) Sdn. Bhd. Civil, Architectural, Infrastr. Turkmenistan / Turkmenbashi Completed Projects
EPIC of 6.000 m² temporary facilities. EPIC of Temporary Facilities of ARR Project EPIC of 6.000 m² temporary facilities. JGC Construction Co. Civil, Architectural, Infrastr. Kazakhstan / Atrau Completed Projects
Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works. The State Commodity and Raw Material Exchange Residential Building Project Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works. Administration of The President Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Reinforced concrete and block works of Technical University. UGMK Technical University Construction Project Reinforced concrete and block works of Technical University. ODD Uralyevrostil Civil, Architectural, Infrastr. Russia / V. Pishma Completed Projects
Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. EPCC of Waste Disposal Facility Project Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant including 550 m sheet piling complete with piping installation (2 meters below sea level). Water Desalination and Intake Line Project Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant includi.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Phase I : Turnkey construction of 6 villas.
Phase II: Turnkey construction of 6 villas combined of 12 separate houses. Zekeriyakoy Villa Project Phase I & II Phase I : Turnkey construction of 6 villas. Phase II: Turnkey construction of 6 villas combined of 12 separate houses. Land Development Project Civil, Architectural, Infrastr. Turkey / istanbul Completed Projects

Information Society Services