PROJECTS Showing Results 10 - 10 of 48

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. Intourist Hotel Project RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
RC Frame & Block Work & Screed works of Hotel consisting of 80.000 m² closed area and 822 bed capacity. Baku White City Hotel Project RC Frame & Block Work & Screed works of Hotel consisting of 80.000 m² closed area and 822 bed capacity. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Engineering, procurement, construction and commissioning of 24.000 m² closed area shipyard project steel and reinforced concrete buildings, infrastructure such as 1.000 m³ sewage treatment plant, area lighting works and other offsite utilities. EPCC of Baku Shipyard Project Engineering, procurement, construction and commissioning of 24.000 m² closed area shipyard project steel and reinforced concrete buildings, infrastruc.. Oil & Gas Trust SOCAR Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Engineering, Procurement, Construction and Commissioning of 712 persons capacity rotation camp including water treatment plant (RO), sewage treatment plant and other necessary facilities.
Total Closed Area : 18.826 m² EPCC of Rotation Camp of South Yoloten Gas Field Development Project Engineering, Procurement, Construction and Commissioning of 712 persons capacity rotation camp including water treatment plant (RO), sewage treatment .. Petrofac International (U.A.E.) Civil, Architectural, Infrastr. Turkmenistan / Yoloten / Mary Completed Projects
Engineering, procurement, construction and commissioning of  6 storey, 7.230 m² closed car park with 181 cars capacity. EPCC of Molokan Gardens Car Park Project Engineering, procurement, construction and commissioning of 6 storey, 7.230 m² closed car park with 181 cars capacity. Pasha Holding Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Dismantling existing ramp, additional slab construction and strengthening of existing columns. 28 May Shopping Mall Project Dismantling existing ramp, additional slab construction and strengthening of existing columns. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Engineering, procurement, construction and commissioning of school project for 600 student. EPCC of Kindergarten & School Project Engineering, procurement, construction and commissioning of school project for 600 student. Administration of The President Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works. EPCC of Residential Building Construction Project Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works. Daykhan Bank State Commercial Bank of Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works. The State Commodity and Raw Material Exchange Residential Building Project Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works. Administration of The President Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Turn-key construction of 12 floors 48 flats residential building. Central Bank Residential Building Construction Project Turn-key construction of 12 floors 48 flats residential building. Central Bank of Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects