Search

CLEAR

PROJECTS Showing Results 10 - 30 of 44

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Turn-key construction of 1 storey building with infrastructure connections. EPCC of Centre of Excellence Building Project Turn-key construction of 1 storey building with infrastructure connections. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Phase I : Procurement & erection of 10 nos onshore cabins, 
Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins including furniture, stairs and roof structure etc. Supply of Onshore & Offshore Cabins Phase I & II Phase I : Procurement & erection of 10 nos onshore cabins, Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins incl.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
EPIC of 6.000 m² temporary facilities. EPIC of Temporary Facilities of ARR Project EPIC of 6.000 m² temporary facilities. JGC Construction Co. Civil, Architectural, Infrastr. Kazakhstan / Atrau Completed Projects
Reinforced concrete works of city water treatment facility. Ashgabat City Water Treatment Project Reinforced concrete works of city water treatment facility. CAI Interbudmontaz Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Boreholes, sampling, in-situ and laboratory testings. Geo-Technical Survey for GTP in CPF Area and Harbour Berth 5 & 6 Boreholes, sampling, in-situ and laboratory testings. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Construction of 1 storey car park, 1 storey Spa, 1 storey restaurant and 5 storey hotel building, consisting of 32,000 m² closed area. EPC of Gabala Hotel & Spa Chenot Construction of 1 storey car park, 1 storey Spa, 1 storey restaurant and 5 storey hotel building, consisting of 32,000 m² closed area. Gilan Holding LLC Civil, Architectural, Infrastr. Azerbaijan Completed Projects
600 nos of 650 dia piles of various lengths from 10 to 19 m and 15.000 m of anchorage works. Ganjlik Mall Project, Piling Works Project 600 nos of 650 dia piles of various lengths from 10 to 19 m and 15.000 m of anchorage works. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Engineering, procurement and construction of Residential Building. EPC of Residential Building Project Engineering, procurement and construction of Residential Building. Administration of The President Turkmenistan Civil, Architectural, Infrastr. Turkmenistan Completed Projects
Engineering, procurement and construction of school. EPC of School for 600 student Project Engineering, procurement and construction of school. Administration of The President Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Engineering, procurement and construction of Kindergarten. EPC of Kindergarten Project for 160 student Engineering, procurement and construction of Kindergarten. Administration of The President Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects

Information Society Services