PROJECTS Showing Results 10 - 20 of 44

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
600 nos of 650 dia piles of various lengths from 10 to 19 m and 15.000 m of anchorage works. Ganjlik Mall Project, Piling Works Project 600 nos of 650 dia piles of various lengths from 10 to 19 m and 15.000 m of anchorage works. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Pile cap breaking, excavation, compaction, gravel layering, insulation and structural works for 3 floor garage, 3 floor podium and 3 towers consisting of 32 floor residence floor. Port Baku Residence Project Pile cap breaking, excavation, compaction, gravel layering, insulation and structural works for 3 floor garage, 3 floor podium and 3 towers consisting.. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Dismantling existing ramp, additional slab construction and strengthening of existing columns. 28 May Shopping Mall Project Dismantling existing ramp, additional slab construction and strengthening of existing columns. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Construction of  6.000 seat capacity Arena for Rhythmic & Artistic Gymnastics. National Gymnastic Arena Project Construction of 6.000 seat capacity Arena for Rhythmic & Artistic Gymnastics. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Engineering, procurement, construction and commissioning of 24.000 m² closed area shipyard project steel and reinforced concrete buildings, infrastructure such as 1.000 m³ sewage treatment plant, area lighting works and other offsite utilities. EPCC of Baku Shipyard Project Engineering, procurement, construction and commissioning of 24.000 m² closed area shipyard project steel and reinforced concrete buildings, infrastruc.. Oil & Gas Trust SOCAR Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
Turn-key construction park project with 30 pieces fountains and green area. EPCC of Gipcak Resting Park Project Turn-key construction park project with 30 pieces fountains and green area. Ministry of Railway Transportation of Turkmenistan Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Phase I : Turnkey construction of 6 villas.
Phase II: Turnkey construction of 6 villas combined of 12 separate houses. Zekeriyakoy Villa Project Phase I & II Phase I : Turnkey construction of 6 villas. Phase II: Turnkey construction of 6 villas combined of 12 separate houses. Land Development Project Civil, Architectural, Infrastr. Turkey / istanbul Completed Projects
Turnkey construction of 8 storey business plaza. Atasehir İLK Doguş Plaza Project Turnkey construction of 8 storey business plaza. Land Development Project Civil, Architectural, Infrastr. Turkey / istanbul Completed Projects
55 bed general intensive care, cardiovascular surgery
intensive care, coronary intensive care units,
45-bed neonatal intensive care unit with a total of 100
bed intensive care units; was designed using the latest
possibilities of technology and hospital architecture. Konya Medicana Hospital Project 55 bed general intensive care, cardiovascular surgery intensive care, coronary intensive care units, 45-bed neonatal intensive care unit with a tota.. Land Development Project Civil, Architectural, Infrastr. Turkey / Konya Completed Projects
EPIC of 6.000 m² temporary facilities. EPIC of Temporary Facilities of ARR Project EPIC of 6.000 m² temporary facilities. JGC Construction Co. Civil, Architectural, Infrastr. Kazakhstan / Atrau Completed Projects

Information Society Services