Search

CLEAR

PROJECTS Showing Results 10 - 44 of 44

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant including 550 m sheet piling complete with piping installation (2 meters below sea level). Water Desalination and Intake Line Project Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant includi.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Phase I : Turnkey construction of 6 villas.
Phase II: Turnkey construction of 6 villas combined of 12 separate houses. Zekeriyakoy Villa Project Phase I & II Phase I : Turnkey construction of 6 villas. Phase II: Turnkey construction of 6 villas combined of 12 separate houses. Land Development Project Civil, Architectural, Infrastr. Turkey / istanbul Completed Projects
RC Frame & Block Work & Screed works of Hotel consisting of 80.000 m² closed area and 822 bed capacity. Baku White City Hotel Project RC Frame & Block Work & Screed works of Hotel consisting of 80.000 m² closed area and 822 bed capacity. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects
RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. Intourist Hotel Project RC Frame & Block Work & Screed works of Hotel consisting of 12.500 m² closed area and 182 bed capacity. Pasha Construction Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects

Information Society Services