![6064264be2915.jpg Three New Wellhead Towers & Associated Pipelines for Water Injection](http://www.ilkconstruction.com/Images/Projeler/Proje/6064264be2915.jpg) |
EPIC For Three New Wellhead Towers & Associated Pipelines for Water Injection
Three New Wellhead Towers & Associated Pipelines for Water Injection
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![5d2323451cd3f.jpg Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facilities in Turkmenistan as a part of the expansion plan for Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) on LAM-A, LAM-B, LAM-C and LAM-28 Platforms.](http://www.ilkconstruction.com/Images/Projeler/Proje/5d2323451cd3f.jpg) |
EPIC of Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) for new Field Instrumentation at LAM-A, LAM-B, LAM-C and LAM-28 Platforms
Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facili..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan / Hazar |
Completed Projects |
![5f114cf1c86c9.jpg Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC](http://www.ilkconstruction.com/Images/Projeler/Proje/5f114cf1c86c9.jpg) |
BISKRA 1,338 MW CCPP Project
Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC
|
Hyundai Engineering Co., Ltd. |
Oil & Gas Power Plant |
Algeria |
Completed Projects |
![5ddf7f2a805a2.jpg Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area in Hazar, Turkmenistan.](http://www.ilkconstruction.com/Images/Projeler/Proje/5ddf7f2a805a2.jpg) |
Design, Procurement and Installation of Fire Detection and Alarm system at Harbour Area in Hazar, Turkmenistan
Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area ..
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan / Hazar |
Completed Projects |
![641c351c84fe1.jpg Removal of existing pedestal cranes and engineering, procurement, installation and commissioning works for new pedestal cranes at existing five numbers of offshore platforms.](http://www.ilkconstruction.com/Images/Projeler/Proje/641c351c84fe1.jpg) |
EPIC of Offshore Pedestal Crane Replacement
Removal of existing pedestal cranes and engineering, procurement, installation and commissioning works for new pedestal cranes at existing five number..
|
Dragon Oil Ltd. |
Oil & Gas |
Turkmenistan / Hazar |
Projects in Progress |
![65e6c381521ca.jpg Civil, Steel Erection, Piping, Painting, Insulation, Equipment Erection, Electrical and Instrumentation Works](http://www.ilkconstruction.com/Images/Projeler/Proje/65e6c381521ca.jpg) |
Basrah Refinery Upgrading Project GC2 Package
Civil, Steel Erection, Piping, Painting, Insulation, Equipment Erection, Electrical and Instrumentation Works
|
JGC Construction Co. |
Oil & Gas |
Iraq |
Projects in Progress |
![644930531958c.jpg Engineering, procurement, construction and commissioning works for enhancing oil water separation by heating multiphase fluid at upstream of 3-phase separation and reduce loading of Heater Treaters at the existing Central Process Site Facility.](http://www.ilkconstruction.com/Images/Projeler/Proje/644930531958c.jpg) |
CPSF Debottlenecking and Capacity Upgrade Project Phase-I
Engineering, procurement, construction and commissioning works for enhancing oil water separation by heating multiphase fluid at upstream of 3-phase s..
|
Dragon Oil Ltd. |
Oil & Gas |
Turkmenistan / Hazar |
Projects in Progress |