PROJECTS Showing Results 10 - 10 of 27

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Civil, Architectural and HVAC works, Building Works, Tank & Silo Installation Works, Soil Investigation Works, Underground Piping Installation & Painting Works, Temporary Access Road to Site, NDE and PWHT work, Temporary Camp Facilities, Manpower & Equipment Supply of Scaffolding Works. Turkmenistan Gas Desulfurization Project Civil, Architectural and HVAC works, Building Works, Tank & Silo Installation Works, Soil Investigation Works, Underground Piping Installation & Paint.. Turkmen Gas / Hyundai Eng. Ltd. Oil & Gas Downstream Turkmenistan / Yoloten / Mary Completed Projects
Piping, Pipe Support, NDT and PWHT, Equipment Erection, Refractory, Insulation, Painting, Electrical & Instrumentation of P1A, P2A and P2B areas of Socar Turkey Aegean Refinery. Aegean Refinery - STAR Project Mechanical, Electrical & Instrumentation Works Piping, Pipe Support, NDT and PWHT, Equipment Erection, Refractory, Insulation, Painting, Electrical & Instrumentation of P1A, P2A and P2B areas of So.. TSGI Mühendislik Insaat Ltd. (Técnicas Reunidas, Saipem and GS Consortium) Oil & Gas Downstream Turkey Completed Projects
Front – End Engineering Design of  Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations Feed for Xarajyan Oil Terminal Front – End Engineering Design of Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations Qaiwan Group Oil & Gas Downstream Iraq / Sulaymaniah Completed Projects
Procurement, fabrication, Integration of Collector Riser Platform. Maghtumguly Collector Riser Platform Project Procurement, fabrication, Integration of Collector Riser Platform. Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
Temporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, blasting & painting, mechanical completion, testing & commissioning, load out, sea fastening, hook up & commissioning. Maghtumguly Drilling Platform-A Project Temporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, b.. Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
Fabrication, erection, installation, NDT and hydro test of 11 pieces fixed & floating roof tanks, painting and commissioning. Tankage Works at OGT Project Fabrication, erection, installation, NDT and hydro test of 11 pieces fixed & floating roof tanks, painting and commissioning. Petronas Carigali (Turkmenistan) Sdn. Bhd., MMHE Technip J.V. - Sumatec Oil & Gas Downstream Turkmenistan / Turkmenbashi Completed Projects
Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum process facilities. EPCC of Central Diyarbekir Oil Development Project Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan Completed Projects
Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water depth is 53.4 m. EPCC of West Diyarbekir Drilling Platform Project Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water de.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Turkmenbashi Completed Projects
EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth. EPCC of Garagol Deniz West Offshore Platform Project EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan Completed Projects
Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant subsea pipeline and cabling works. (Total : 3 Jackets - Topsides - Drilling Decks - Boatlandings and 14 Piles) EPIC of Offshore Transportation & Installation Works Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant s.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Kiyanly Completed Projects