![53d42acaaa5eb.jpg 42” piping and LOT B Valve Station Civil Works (Excavation, Backfill, Formwork, Re-bar, Structural Concrete) Mechanical (Fabrication, Installation, GTAW and SMAW welding, Tie-in) E&I (All BVS Electrical works and tests). Insulation Works Testing & Commissioning.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d42acaaa5eb.jpg) |
BP Baku - Tibilisi - Ceyhan Crude Pipe Line Project
42” piping and LOT B Valve Station Civil Works (Excavation, Backfill, Formwork, Re-bar, Structural Concrete) Mechanical (Fabrication, Installation, GT..
|
Botaş |
Oil & Gas Downstream |
Turkey / Erzurum-Erzincan |
Completed Projects |
![549953df814a5.jpg Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, helidecks, subsea and dubsea pipelines.](http://www.ilkconstruction.com/Images/Projeler/Proje/549953df814a5.jpg) |
EPIC of LAM-F Drilling Platform Project
Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, he..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan / Kiyanly / Turkmenbashi |
Completed Projects |
![566ea9b9c26b3.JPG Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists of Cargo Deck, Main Deck, Intermediate Deck and Drain Deck.](http://www.ilkconstruction.com/Images/Projeler/Proje/566ea9b9c26b3.JPG) |
EPIC of Wellhead Platform LAM-C Project
Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists ..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![59e5d9900ce3b.jpg Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area.](http://www.ilkconstruction.com/Images/Projeler/Proje/59e5d9900ce3b.jpg) |
EPIC of Crude Oil Tank Farm Terminal Project
Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area.
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan |
Completed Projects |
![53d429df4b83b.jpg Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and blasting, commissioning etc.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d429df4b83b.jpg) |
EPIC of Interconnecting Pipeline Project
Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and..
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan / Hazar |
Completed Projects |
![598ead798ef1d.jpg Removal of old derricks (6 nos) from non-operating offshore oil platforms](http://www.ilkconstruction.com/Images/Projeler/Proje/598ead798ef1d.jpg) |
Derrick Removal at Offshore
Removal of old derricks (6 nos) from non-operating offshore oil platforms
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![6064264be2915.jpg Three New Wellhead Towers & Associated Pipelines for Water Injection](http://www.ilkconstruction.com/Images/Projeler/Proje/6064264be2915.jpg) |
EPIC For Three New Wellhead Towers & Associated Pipelines for Water Injection
Three New Wellhead Towers & Associated Pipelines for Water Injection
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![5d2323451cd3f.jpg Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facilities in Turkmenistan as a part of the expansion plan for Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) on LAM-A, LAM-B, LAM-C and LAM-28 Platforms.](http://www.ilkconstruction.com/Images/Projeler/Proje/5d2323451cd3f.jpg) |
EPIC of Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) for new Field Instrumentation at LAM-A, LAM-B, LAM-C and LAM-28 Platforms
Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facili..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan / Hazar |
Completed Projects |
![5ddf7f2a805a2.jpg Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area in Hazar, Turkmenistan.](http://www.ilkconstruction.com/Images/Projeler/Proje/5ddf7f2a805a2.jpg) |
Design, Procurement and Installation of Fire Detection and Alarm system at Harbour Area in Hazar, Turkmenistan
Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area ..
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan / Hazar |
Completed Projects |
![641c351c84fe1.jpg Removal of existing pedestal cranes and engineering, procurement, installation and commissioning works for new pedestal cranes at existing five numbers of offshore platforms.](http://www.ilkconstruction.com/Images/Projeler/Proje/641c351c84fe1.jpg) |
EPIC of Offshore Pedestal Crane Replacement
Removal of existing pedestal cranes and engineering, procurement, installation and commissioning works for new pedestal cranes at existing five number..
|
Dragon Oil Ltd. |
Oil & Gas |
Turkmenistan / Hazar |
Projects in Progress |