![644930531958c.jpg Engineering, procurement, construction and commissioning works for enhancing oil water separation by heating multiphase fluid at upstream of 3-phase separation and reduce loading of Heater Treaters at the existing Central Process Site Facility.](http://www.ilkconstruction.com/Images/Projeler/Proje/644930531958c.jpg) |
CPSF Debottlenecking and Capacity Upgrade Project Phase-I
Engineering, procurement, construction and commissioning works for enhancing oil water separation by heating multiphase fluid at upstream of 3-phase s..
|
Dragon Oil Ltd. |
Oil & Gas |
Turkmenistan / Hazar |
Projects in Progress |
![566a9ae2c36b3.jpg Soil investigation, site preparation, building, civil, electrical, instrumentation, equipment, field tank, HVAC, insulation and piping works.](http://www.ilkconstruction.com/Images/Projeler/Proje/566a9ae2c36b3.jpg) |
Gas Treatment Plant Project Onshore Gas Terminal (GTPOGT) Expansion and Modification for Garagol Deniz West Oil Development
Soil investigation, site preparation, building, civil, electrical, instrumentation, equipment, field tank, HVAC, insulation and piping works.
|
Hyundai Engineering Co., Ltd. |
Oil & Gas Downstream |
Turkmenistan / Kiyanly / Turkmenbashi |
Completed Projects |
![56824e079d10b.jpeg Civil, Architectural, Steel, Piping, HVAC, Blasting&Painting, Firefighting, Insulation, NDE and Temporary Works of Ethane Cracker and Polyprophylene and Polyethylene Plant](http://www.ilkconstruction.com/Images/Projeler/Proje/56824e079d10b.jpeg) |
TACE - Turkmenistan Ethane Cracker and Polyprophylene and Polyethylene Plant
Civil, Architectural, Steel, Piping, HVAC, Blasting&Painting, Firefighting, Insulation, NDE and Temporary Works of Ethane Cracker and Polyprophylene a..
|
Hyundai Engineering Co., Ltd. |
Oil & Gas Downstream |
Turkmenistan |
Completed Projects |
![5f114cf1c86c9.jpg Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC](http://www.ilkconstruction.com/Images/Projeler/Proje/5f114cf1c86c9.jpg) |
BISKRA 1,338 MW CCPP Project
Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC
|
Hyundai Engineering Co., Ltd. |
Oil & Gas Power Plant |
Algeria |
Completed Projects |
![65e6c381521ca.jpg Civil, Steel Erection, Piping, Painting, Insulation, Equipment Erection, Electrical and Instrumentation Works](http://www.ilkconstruction.com/Images/Projeler/Proje/65e6c381521ca.jpg) |
Basrah Refinery Upgrading Project GC2 Package
Civil, Steel Erection, Piping, Painting, Insulation, Equipment Erection, Electrical and Instrumentation Works
|
JGC Construction Co. |
Oil & Gas |
Iraq |
Projects in Progress |
![53d4351ef2fd3.jpg EPCC of CPF and GTU Substation Buildings and Pipe Spool.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d4351ef2fd3.jpg) |
EPCC of Gas Field Development Project EPCC of CPF and GTU Substation Buildings and Pipe Spool Fabrication Works.
EPCC of CPF and GTU Substation Buildings and Pipe Spool.
|
Petrofac International (U.A.E.) |
Oil & Gas Downstream |
Turkmenistan / Yoloten / Mary |
Completed Projects |
![53d43a0ae9399.jpg Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d43a0ae9399.jpg) |
Gas Treatment Units (GTU) of South Yoloten Gas Field Development Project
Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system.
|
Petrofac International (U.A.E.) |
Oil & Gas Downstream |
Turkmenistan / Yoloten / Mary |
Completed Projects |
![566ab5e9cf5ec.JPG Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum process facilities.](http://www.ilkconstruction.com/Images/Projeler/Proje/566ab5e9cf5ec.JPG) |
EPCC of Central Diyarbekir Oil Development Project
Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum..
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![53d4107d4ed64.jpg Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water depth is 53.4 m.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d4107d4ed64.jpg) |
EPCC of West Diyarbekir Drilling Platform Project
Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water de..
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan / Turkmenbashi |
Completed Projects |
![549ab09b18b39.png EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth.](http://www.ilkconstruction.com/Images/Projeler/Proje/549ab09b18b39.png) |
EPCC of Garagol Deniz West Offshore Platform Project
EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth.
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |