![5f114cf1c86c9.jpg Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC](http://www.ilkconstruction.com/Images/Projeler/Proje/5f114cf1c86c9.jpg) |
BISKRA 1,338 MW CCPP Project
Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC
|
Hyundai Engineering Co., Ltd. |
Oil & Gas Power Plant |
Algeria |
Completed Projects |
![599adff2e1268.png Front – End Engineering Design of Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations](http://www.ilkconstruction.com/Images/Projeler/Proje/599adff2e1268.png) |
Feed for Xarajyan Oil Terminal
Front – End Engineering Design of Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations
|
Qaiwan Group |
Oil & Gas Downstream |
Iraq / Sulaymaniah |
Completed Projects |
![65e6c381521ca.jpg Civil, Steel Erection, Piping, Painting, Insulation, Equipment Erection, Electrical and Instrumentation Works](http://www.ilkconstruction.com/Images/Projeler/Proje/65e6c381521ca.jpg) |
Basrah Refinery Upgrading Project GC2 Package
Civil, Steel Erection, Piping, Painting, Insulation, Equipment Erection, Electrical and Instrumentation Works
|
JGC Construction Co. |
Oil & Gas |
Iraq |
Projects in Progress |
![53d42acaaa5eb.jpg 42” piping and LOT B Valve Station Civil Works (Excavation, Backfill, Formwork, Re-bar, Structural Concrete) Mechanical (Fabrication, Installation, GTAW and SMAW welding, Tie-in) E&I (All BVS Electrical works and tests). Insulation Works Testing & Commissioning.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d42acaaa5eb.jpg) |
BP Baku - Tibilisi - Ceyhan Crude Pipe Line Project
42” piping and LOT B Valve Station Civil Works (Excavation, Backfill, Formwork, Re-bar, Structural Concrete) Mechanical (Fabrication, Installation, GT..
|
Botaş |
Oil & Gas Downstream |
Turkey / Erzurum-Erzincan |
Completed Projects |
![59e0652074b29.jpg Piping, Pipe Support, NDT and PWHT, Equipment Erection, Refractory, Insulation, Painting, Electrical & Instrumentation of P1A, P2A and P2B areas of Socar Turkey Aegean Refinery.](http://www.ilkconstruction.com/Images/Projeler/Proje/59e0652074b29.jpg) |
Aegean Refinery - STAR Project Mechanical, Electrical & Instrumentation Works
Piping, Pipe Support, NDT and PWHT, Equipment Erection, Refractory, Insulation, Painting, Electrical & Instrumentation of P1A, P2A and P2B areas of So..
|
TSGI Mühendislik Insaat Ltd. (Técnicas Reunidas, Saipem and GS Consortium) |
Oil & Gas Downstream |
Turkey |
Completed Projects |
![549953df814a5.jpg Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, helidecks, subsea and dubsea pipelines.](http://www.ilkconstruction.com/Images/Projeler/Proje/549953df814a5.jpg) |
EPIC of LAM-F Drilling Platform Project
Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, he..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan / Kiyanly / Turkmenbashi |
Completed Projects |
![566ab5e9cf5ec.JPG Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum process facilities.](http://www.ilkconstruction.com/Images/Projeler/Proje/566ab5e9cf5ec.JPG) |
EPCC of Central Diyarbekir Oil Development Project
Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum..
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![53d4107d4ed64.jpg Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water depth is 53.4 m.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d4107d4ed64.jpg) |
EPCC of West Diyarbekir Drilling Platform Project
Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water de..
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan / Turkmenbashi |
Completed Projects |
![549ab09b18b39.png EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth.](http://www.ilkconstruction.com/Images/Projeler/Proje/549ab09b18b39.png) |
EPCC of Garagol Deniz West Offshore Platform Project
EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth.
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![53d41853ac7d0.jpg Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant subsea pipeline and cabling works. (Total : 3 Jackets - Topsides - Drilling Decks - Boatlandings and 14 Piles)](http://www.ilkconstruction.com/Images/Projeler/Proje/53d41853ac7d0.jpg) |
EPIC of Offshore Transportation & Installation Works
Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant s..
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan / Kiyanly |
Completed Projects |