![53d429df4b83b.jpg Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and blasting, commissioning etc.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d429df4b83b.jpg) |
EPIC of Interconnecting Pipeline Project
Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and..
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan / Hazar |
Completed Projects |
![53d43a0ae9399.jpg Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d43a0ae9399.jpg) |
Gas Treatment Units (GTU) of South Yoloten Gas Field Development Project
Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system.
|
Petrofac International (U.A.E.) |
Oil & Gas Downstream |
Turkmenistan / Yoloten / Mary |
Completed Projects |
![566a9ae2c36b3.jpg Soil investigation, site preparation, building, civil, electrical, instrumentation, equipment, field tank, HVAC, insulation and piping works.](http://www.ilkconstruction.com/Images/Projeler/Proje/566a9ae2c36b3.jpg) |
Gas Treatment Plant Project Onshore Gas Terminal (GTPOGT) Expansion and Modification for Garagol Deniz West Oil Development
Soil investigation, site preparation, building, civil, electrical, instrumentation, equipment, field tank, HVAC, insulation and piping works.
|
Hyundai Engineering Co., Ltd. |
Oil & Gas Downstream |
Turkmenistan / Kiyanly / Turkmenbashi |
Completed Projects |
![53d4351ef2fd3.jpg EPCC of CPF and GTU Substation Buildings and Pipe Spool.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d4351ef2fd3.jpg) |
EPCC of Gas Field Development Project EPCC of CPF and GTU Substation Buildings and Pipe Spool Fabrication Works.
EPCC of CPF and GTU Substation Buildings and Pipe Spool.
|
Petrofac International (U.A.E.) |
Oil & Gas Downstream |
Turkmenistan / Yoloten / Mary |
Completed Projects |
![549ab09b18b39.png EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth.](http://www.ilkconstruction.com/Images/Projeler/Proje/549ab09b18b39.png) |
EPCC of Garagol Deniz West Offshore Platform Project
EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth.
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![599adff2e1268.png Front – End Engineering Design of Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations](http://www.ilkconstruction.com/Images/Projeler/Proje/599adff2e1268.png) |
Feed for Xarajyan Oil Terminal
Front – End Engineering Design of Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations
|
Qaiwan Group |
Oil & Gas Downstream |
Iraq / Sulaymaniah |
Completed Projects |
![6064264be2915.jpg Three New Wellhead Towers & Associated Pipelines for Water Injection](http://www.ilkconstruction.com/Images/Projeler/Proje/6064264be2915.jpg) |
EPIC For Three New Wellhead Towers & Associated Pipelines for Water Injection
Three New Wellhead Towers & Associated Pipelines for Water Injection
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![5ddf7f2a805a2.jpg Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area in Hazar, Turkmenistan.](http://www.ilkconstruction.com/Images/Projeler/Proje/5ddf7f2a805a2.jpg) |
Design, Procurement and Installation of Fire Detection and Alarm system at Harbour Area in Hazar, Turkmenistan
Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area ..
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan / Hazar |
Completed Projects |
![598ead798ef1d.jpg Removal of old derricks (6 nos) from non-operating offshore oil platforms](http://www.ilkconstruction.com/Images/Projeler/Proje/598ead798ef1d.jpg) |
Derrick Removal at Offshore
Removal of old derricks (6 nos) from non-operating offshore oil platforms
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![5d2323451cd3f.jpg Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facilities in Turkmenistan as a part of the expansion plan for Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) on LAM-A, LAM-B, LAM-C and LAM-28 Platforms.](http://www.ilkconstruction.com/Images/Projeler/Proje/5d2323451cd3f.jpg) |
EPIC of Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) for new Field Instrumentation at LAM-A, LAM-B, LAM-C and LAM-28 Platforms
Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facili..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan / Hazar |
Completed Projects |