Aegean Refinery - STAR Project Mechanical, Electrical & Instrumentation Works
Piping, Pipe Support, NDT and PWHT, Equipment Erection, Refractory, Insulation, Painting, Electrical & Instrumentation of P1A, P2A and P2B areas of So..
|
TSGI Mühendislik Insaat Ltd. (Técnicas Reunidas, Saipem and GS Consortium) |
Oil & Gas Downstream |
Turkey |
Completed Projects |
|
Basrah Refinery Upgrading Project GC2 Package
Civil, Steel Erection, Piping, Painting, Insulation, Equipment Erection, Electrical and Instrumentation Works
|
JGC Construction Co. |
Oil & Gas |
Iraq |
Projects in Progress |
|
BISKRA 1,338 MW CCPP Project
Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC
|
Hyundai Engineering Co., Ltd. |
Oil & Gas Power Plant |
Algeria |
Completed Projects |
|
BP Baku - Tibilisi - Ceyhan Crude Pipe Line Project
42” piping and LOT B Valve Station Civil Works (Excavation, Backfill, Formwork, Re-bar, Structural Concrete) Mechanical (Fabrication, Installation, GT..
|
Botaş |
Oil & Gas Downstream |
Turkey / Erzurum-Erzincan |
Completed Projects |
|
EPCC of Central Diyarbekir Oil Development Project
Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum..
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
|
CPSF Debottlenecking and Capacity Upgrade Project Phase-I
Engineering, procurement, construction and commissioning works for enhancing oil water separation by heating multiphase fluid at upstream of 3-phase s..
|
Dragon Oil Ltd. |
Oil & Gas |
Turkmenistan / Hazar |
Projects in Progress |
|
EPIC of Crude Oil Tank Farm Terminal Project
Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area.
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan |
Completed Projects |
|
EPIC of Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) for new Field Instrumentation at LAM-A, LAM-B, LAM-C and LAM-28 Platforms
Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facili..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan / Hazar |
Completed Projects |
|
Derrick Removal at Offshore
Removal of old derricks (6 nos) from non-operating offshore oil platforms
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
|
Design, Procurement and Installation of Fire Detection and Alarm system at Harbour Area in Hazar, Turkmenistan
Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area ..
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan / Hazar |
Completed Projects |