![5d2323451cd3f.jpg Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facilities in Turkmenistan as a part of the expansion plan for Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) on LAM-A, LAM-B, LAM-C and LAM-28 Platforms.](http://www.ilkconstruction.com/Images/Projeler/Proje/5d2323451cd3f.jpg) |
EPIC of Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) for new Field Instrumentation at LAM-A, LAM-B, LAM-C and LAM-28 Platforms
Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facili..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan / Hazar |
Completed Projects |
![5f114cf1c86c9.jpg Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC](http://www.ilkconstruction.com/Images/Projeler/Proje/5f114cf1c86c9.jpg) |
BISKRA 1,338 MW CCPP Project
Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC
|
Hyundai Engineering Co., Ltd. |
Oil & Gas Power Plant |
Algeria |
Completed Projects |
![5ddf7f2a805a2.jpg Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area in Hazar, Turkmenistan.](http://www.ilkconstruction.com/Images/Projeler/Proje/5ddf7f2a805a2.jpg) |
Design, Procurement and Installation of Fire Detection and Alarm system at Harbour Area in Hazar, Turkmenistan
Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area ..
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan / Hazar |
Completed Projects |
![566ab5e9cf5ec.JPG Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum process facilities.](http://www.ilkconstruction.com/Images/Projeler/Proje/566ab5e9cf5ec.JPG) |
EPCC of Central Diyarbekir Oil Development Project
Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum..
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![549953df814a5.jpg Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, helidecks, subsea and dubsea pipelines.](http://www.ilkconstruction.com/Images/Projeler/Proje/549953df814a5.jpg) |
EPIC of LAM-F Drilling Platform Project
Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, he..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan / Kiyanly / Turkmenbashi |
Completed Projects |
![53d41853ac7d0.jpg Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant subsea pipeline and cabling works. (Total : 3 Jackets - Topsides - Drilling Decks - Boatlandings and 14 Piles)](http://www.ilkconstruction.com/Images/Projeler/Proje/53d41853ac7d0.jpg) |
EPIC of Offshore Transportation & Installation Works
Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant s..
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan / Kiyanly |
Completed Projects |
![53d4351ef2fd3.jpg EPCC of CPF and GTU Substation Buildings and Pipe Spool.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d4351ef2fd3.jpg) |
EPCC of Gas Field Development Project EPCC of CPF and GTU Substation Buildings and Pipe Spool Fabrication Works.
EPCC of CPF and GTU Substation Buildings and Pipe Spool.
|
Petrofac International (U.A.E.) |
Oil & Gas Downstream |
Turkmenistan / Yoloten / Mary |
Completed Projects |
![53d4364331382.jpg Fabrication, erection, installation, NDT and hydro test of 11 pieces fixed & floating roof tanks, painting and commissioning.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d4364331382.jpg) |
Tankage Works at OGT Project
Fabrication, erection, installation, NDT and hydro test of 11 pieces fixed & floating roof tanks, painting and commissioning.
|
Petronas Carigali (Turkmenistan) Sdn. Bhd., MMHE Technip J.V. - Sumatec |
Oil & Gas Downstream |
Turkmenistan / Turkmenbashi |
Completed Projects |
![53d43a0ae9399.jpg Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d43a0ae9399.jpg) |
Gas Treatment Units (GTU) of South Yoloten Gas Field Development Project
Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system.
|
Petrofac International (U.A.E.) |
Oil & Gas Downstream |
Turkmenistan / Yoloten / Mary |
Completed Projects |
![566ea9b9c26b3.JPG Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists of Cargo Deck, Main Deck, Intermediate Deck and Drain Deck.](http://www.ilkconstruction.com/Images/Projeler/Proje/566ea9b9c26b3.JPG) |
EPIC of Wellhead Platform LAM-C Project
Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Wellhead platform. Platform consists ..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |