PROJECTS Showing Results 10 - 27 of 27

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Procurement, fabrication, Integration of Collector Riser Platform. Maghtumguly Collector Riser Platform Project Procurement, fabrication, Integration of Collector Riser Platform. Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
Temporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, blasting & painting, mechanical completion, testing & commissioning, load out, sea fastening, hook up & commissioning. Maghtumguly Drilling Platform-A Project Temporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, b.. Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and blasting, commissioning etc. EPIC of Interconnecting Pipeline Project Turn-key construction of 30” gas pipe line including cathodic protection, engineering, construction, installation, valves and valve pits, painting and.. Dragon Oil Ltd. Oil & Gas Downstream Turkmenistan / Hazar Completed Projects
Civil, Architectural and HVAC works, Building Works, Tank & Silo Installation Works, Soil Investigation Works, Underground Piping Installation & Painting Works, Temporary Access Road to Site, NDE and PWHT work, Temporary Camp Facilities, Manpower & Equipment Supply of Scaffolding Works. Turkmenistan Gas Desulfurization Project Civil, Architectural and HVAC works, Building Works, Tank & Silo Installation Works, Soil Investigation Works, Underground Piping Installation & Paint.. Turkmen Gas / Hyundai Eng. Ltd. Oil & Gas Downstream Turkmenistan / Yoloten / Mary Completed Projects
Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water depth is 53.4 m. EPCC of West Diyarbekir Drilling Platform Project Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water de.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Turkmenbashi Completed Projects
Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area. EPIC of Crude Oil Tank Farm Terminal Project Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area. Dragon Oil Ltd. Oil & Gas Downstream Turkmenistan Completed Projects
Front – End Engineering Design of  Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations Feed for Xarajyan Oil Terminal Front – End Engineering Design of Storage and Blending Tanks as shown in below table and detailed engineering for Gasoline Tank Foundations Qaiwan Group Oil & Gas Downstream Iraq / Sulaymaniah Completed Projects

Information Society Services