|
Derrick Removal at Offshore
Removal of old derricks (6 nos) from non-operating offshore oil platforms
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
|
EPIC For Three New Wellhead Towers & Associated Pipelines for Water Injection
Three New Wellhead Towers & Associated Pipelines for Water Injection
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
|
EPIC of Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) for new Field Instrumentation at LAM-A, LAM-B, LAM-C and LAM-28 Platforms
Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facili..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan / Hazar |
Completed Projects |
|
Design, Procurement and Installation of Fire Detection and Alarm system at Harbour Area in Hazar, Turkmenistan
Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area ..
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan / Hazar |
Completed Projects |
|
EPIC of Offshore Pedestal Crane Replacement
Removal of existing pedestal cranes and engineering, procurement, installation and commissioning works for new pedestal cranes at existing five number..
|
Dragon Oil Ltd. |
Oil & Gas |
Turkmenistan / Hazar |
Projects in Progress |
|
CPSF Debottlenecking and Capacity Upgrade Project Phase-I
Engineering, procurement, construction and commissioning works for enhancing oil water separation by heating multiphase fluid at upstream of 3-phase s..
|
Dragon Oil Ltd. |
Oil & Gas |
Turkmenistan / Hazar |
Projects in Progress |
|
BP Baku - Tibilisi - Ceyhan Crude Pipe Line Project
42” piping and LOT B Valve Station Civil Works (Excavation, Backfill, Formwork, Re-bar, Structural Concrete) Mechanical (Fabrication, Installation, GT..
|
Botaş |
Oil & Gas Downstream |
Turkey / Erzurum-Erzincan |
Completed Projects |