![59e5d9900ce3b.jpg Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area.](http://www.ilkconstruction.com/Images/Projeler/Proje/59e5d9900ce3b.jpg) |
EPIC of Crude Oil Tank Farm Terminal Project
Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area.
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan |
Completed Projects |
![644930531958c.jpg Engineering, procurement, construction and commissioning works for enhancing oil water separation by heating multiphase fluid at upstream of 3-phase separation and reduce loading of Heater Treaters at the existing Central Process Site Facility.](http://www.ilkconstruction.com/Images/Projeler/Proje/644930531958c.jpg) |
CPSF Debottlenecking and Capacity Upgrade Project Phase-I
Engineering, procurement, construction and commissioning works for enhancing oil water separation by heating multiphase fluid at upstream of 3-phase s..
|
Dragon Oil Ltd. |
Oil & Gas |
Turkmenistan / Hazar |
Projects in Progress |
![566ab5e9cf5ec.JPG Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum process facilities.](http://www.ilkconstruction.com/Images/Projeler/Proje/566ab5e9cf5ec.JPG) |
EPCC of Central Diyarbekir Oil Development Project
Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum..
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![53d42acaaa5eb.jpg 42” piping and LOT B Valve Station Civil Works (Excavation, Backfill, Formwork, Re-bar, Structural Concrete) Mechanical (Fabrication, Installation, GTAW and SMAW welding, Tie-in) E&I (All BVS Electrical works and tests). Insulation Works Testing & Commissioning.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d42acaaa5eb.jpg) |
BP Baku - Tibilisi - Ceyhan Crude Pipe Line Project
42” piping and LOT B Valve Station Civil Works (Excavation, Backfill, Formwork, Re-bar, Structural Concrete) Mechanical (Fabrication, Installation, GT..
|
Botaş |
Oil & Gas Downstream |
Turkey / Erzurum-Erzincan |
Completed Projects |
![5f114cf1c86c9.jpg Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC](http://www.ilkconstruction.com/Images/Projeler/Proje/5f114cf1c86c9.jpg) |
BISKRA 1,338 MW CCPP Project
Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC
|
Hyundai Engineering Co., Ltd. |
Oil & Gas Power Plant |
Algeria |
Completed Projects |
![65e6c381521ca.jpg Civil, Steel Erection, Piping, Painting, Insulation, Equipment Erection, Electrical and Instrumentation Works](http://www.ilkconstruction.com/Images/Projeler/Proje/65e6c381521ca.jpg) |
Basrah Refinery Upgrading Project GC2 Package
Civil, Steel Erection, Piping, Painting, Insulation, Equipment Erection, Electrical and Instrumentation Works
|
JGC Construction Co. |
Oil & Gas |
Iraq |
Projects in Progress |
![59e0652074b29.jpg Piping, Pipe Support, NDT and PWHT, Equipment Erection, Refractory, Insulation, Painting, Electrical & Instrumentation of P1A, P2A and P2B areas of Socar Turkey Aegean Refinery.](http://www.ilkconstruction.com/Images/Projeler/Proje/59e0652074b29.jpg) |
Aegean Refinery - STAR Project Mechanical, Electrical & Instrumentation Works
Piping, Pipe Support, NDT and PWHT, Equipment Erection, Refractory, Insulation, Painting, Electrical & Instrumentation of P1A, P2A and P2B areas of So..
|
TSGI Mühendislik Insaat Ltd. (Técnicas Reunidas, Saipem and GS Consortium) |
Oil & Gas Downstream |
Turkey |
Completed Projects |