![53d43a0ae9399.jpg Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system.](http://www.ilkconstruction.com/Images/Projeler/Proje/53d43a0ae9399.jpg) |
Gas Treatment Units (GTU) of South Yoloten Gas Field Development Project
Engineering, Procurement, Installation and Commissioning of 4 nos Gas Treatment Units each has 5 BCMA capacity natural gas primary treatment system.
|
Petrofac International (U.A.E.) |
Oil & Gas Downstream |
Turkmenistan / Yoloten / Mary |
Completed Projects |
![53d41853ac7d0.jpg Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant subsea pipeline and cabling works. (Total : 3 Jackets - Topsides - Drilling Decks - Boatlandings and 14 Piles)](http://www.ilkconstruction.com/Images/Projeler/Proje/53d41853ac7d0.jpg) |
EPIC of Offshore Transportation & Installation Works
Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant s..
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan / Kiyanly |
Completed Projects |
![549953df814a5.jpg Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, helidecks, subsea and dubsea pipelines.](http://www.ilkconstruction.com/Images/Projeler/Proje/549953df814a5.jpg) |
EPIC of LAM-F Drilling Platform Project
Engineering, Procurement, Fabrication, Integration, Load Out, Piling, Offshore Installation and Commissioning of Drilling platform, living quarter, he..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan / Kiyanly / Turkmenbashi |
Completed Projects |
![566ab5e9cf5ec.JPG Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum process facilities.](http://www.ilkconstruction.com/Images/Projeler/Proje/566ab5e9cf5ec.JPG) |
EPCC of Central Diyarbekir Oil Development Project
Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum..
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![6064264be2915.jpg Three New Wellhead Towers & Associated Pipelines for Water Injection](http://www.ilkconstruction.com/Images/Projeler/Proje/6064264be2915.jpg) |
EPIC For Three New Wellhead Towers & Associated Pipelines for Water Injection
Three New Wellhead Towers & Associated Pipelines for Water Injection
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![5d2323451cd3f.jpg Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facilities in Turkmenistan as a part of the expansion plan for Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) on LAM-A, LAM-B, LAM-C and LAM-28 Platforms.](http://www.ilkconstruction.com/Images/Projeler/Proje/5d2323451cd3f.jpg) |
EPIC of Data Acquisition and Monitoring System (DAMS) Augmentation (Phase 3) for new Field Instrumentation at LAM-A, LAM-B, LAM-C and LAM-28 Platforms
Engineering, Procurement, Installation, Testing and Commissioning support for the new field instrumentation works at DOTL\'s offshore operating facili..
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan / Hazar |
Completed Projects |
![5f114cf1c86c9.jpg Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC](http://www.ilkconstruction.com/Images/Projeler/Proje/5f114cf1c86c9.jpg) |
BISKRA 1,338 MW CCPP Project
Mechanical, Piping, Piping Support, Insulation, Painting of HRSG and ACC
|
Hyundai Engineering Co., Ltd. |
Oil & Gas Power Plant |
Algeria |
Completed Projects |
![5ddf7f2a805a2.jpg Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area in Hazar, Turkmenistan.](http://www.ilkconstruction.com/Images/Projeler/Proje/5ddf7f2a805a2.jpg) |
Design, Procurement and Installation of Fire Detection and Alarm system at Harbour Area in Hazar, Turkmenistan
Design, Procurement and Installation of Fire Detection and Alarm system as per NFPA 72/GOST standard at Dragon Oil (Turkmenistan) Ltd.’s Harbour Area ..
|
Dragon Oil Ltd. |
Oil & Gas Downstream |
Turkmenistan / Hazar |
Completed Projects |
![598ead798ef1d.jpg Removal of old derricks (6 nos) from non-operating offshore oil platforms](http://www.ilkconstruction.com/Images/Projeler/Proje/598ead798ef1d.jpg) |
Derrick Removal at Offshore
Removal of old derricks (6 nos) from non-operating offshore oil platforms
|
Dragon Oil Ltd. |
Oil & Gas Upstream |
Turkmenistan |
Completed Projects |
![566a9ae2c36b3.jpg Soil investigation, site preparation, building, civil, electrical, instrumentation, equipment, field tank, HVAC, insulation and piping works.](http://www.ilkconstruction.com/Images/Projeler/Proje/566a9ae2c36b3.jpg) |
Gas Treatment Plant Project Onshore Gas Terminal (GTPOGT) Expansion and Modification for Garagol Deniz West Oil Development
Soil investigation, site preparation, building, civil, electrical, instrumentation, equipment, field tank, HVAC, insulation and piping works.
|
Hyundai Engineering Co., Ltd. |
Oil & Gas Downstream |
Turkmenistan / Kiyanly / Turkmenbashi |
Completed Projects |